EARTHMOVING

Site preparation - Rising a protection dike around the perimeter to prevent tidal flow to enter the works area.  The retaining wall must be high and strong enough to withhold the highest seasonal tide.

Partial Farm layout

Soil testing - strata samples collected- . Determination of foundations depth ; control of quality and thickness of the superficial soil .

sampling

The earthmoving works : ponds bottom levelling and drains excavation,dikes elevation and compaction

Buiding ponds, Phase1 works

to ponds completion and start of farming operations.

Farming operations

goto : HydroTech Solutions [Works]

 

The protection dikes on works site perimeter

The ponds implantation

The soil fondation verification

Drain excavation

Compacting the dikes

 